Location: Las Vegas, NV
Fabric Type: PTFE
Architect: ZW Zunino & Associates
General Contractor: Apco Construction
Owner: City of Las Vegas
Completion Date: 2008

Centennial Hills Phase Three by FabriTec Structures was the last phase of a very successful city development just outside Las Vegas, Nevada. Phase One was a playground and sports field project, Phase Two was an Aquatic Facility and Phase Three is a high end performance space for outdoor concerts. The project gives the city a venue to host festive outdoor events and provides a first class amenity to the public.

The client wanted a unique amphitheater structure to serve as a focal point and provide shade for the concert performers. In an effort to avoid disrupting the natural flow of the land, the architects sought to build a park that fully embraced the surrounding landscape. The large tensile amphitheater is sunken into a natural bowl with the majority of the seating on the grass off a naturally sloping hill. The size of the steel support elements gives the amphitheater a powerful ambiance. The Phase Three addition completed over 300 acres of city development with a bang!

Get A Free Consultation

Get a free tensile membrane structure consultation with the most experienced designers and engineers in the industry.