Location: Buffalo, NY
Fabric Type: SFV
Project Size: 307 sq ft
Architect: Cristina Chavez
Owner: Buffalo Zoo
Completion Date: June 18, 2016

There were quite a few challenges on the project due to the design changes, winching system for feed bags, tight schedule and small panel. FabriTec thanks all of those involved for all their efforts in making everything happen in the timeframe they did – 5 weeks start to finish for a custom structure with a specialized winching system.

The bucket is connected to a geared winch through the conduit to raise it up and down. FabriTec came up with the design on that with Hanes Supply.